Contracting
Civil & Infrastructure
Trench excavation and backfill for utilities: 14.5 km at 2.4 m depth
Selected work. Client names are shown only where approved.
Contracting
Trench excavation and backfill for utilities: 14.5 km at 2.4 m depth
Contracting
Foundations and slabs: 8,500 m³ concrete placed, 1,120 tonnes of rebar
Contracting
Carbon steel process piping: 4,200 m installed, hydrotested at 150 bar
Contracting
Water tank fabrication: 4 units, 2,500 m³ capacity each
Contracting
HVAC installation: 1,800 TR of chilled water plant, 16 AHUs
Technology
School network: 140 access points, 28 switches, firewall FortiGate 200F
Technology
Fibre laying: 45 km through HDPE ducts, splicing at 64 FDTs
Technology
Point-to-point backhaul: 8 links over 45 km
Technology
CCTV installation: 180 cameras, Milestone XProtect
Technology
Access control installation: 96 readers
Maintenance Services
Motor rewinding: 12 motors, 75 kW range
Maintenance Services
Pump overhaul: 18 pumps, 45 valves tested
Maintenance Services
Chiller servicing: 6 chillers, 3,200 TR total
Facility Management
Cleaning services: 45,000 m² maintained